Commit Graph
8 Commits
Author SHA1 Message Date
prxnvt 4d26e395fc Merge #2550 (d4096eee, with main at f6b0cec6) into #2145
# Conflicts:
#	crates/engine/src/lib.rs
2026-10-26 00:26:35 -04:00
prxnvt f225cd1026 Engine: Check Macro waits while a macro is being debugged
`macro.check` is a query, so the debugger's lock let it through, but its dry run runs the macro's
steps, which the lock refuses: the check reported the lock as the failure of a step. It now waits
with "Finish or stop the macro first", as other commands that change the workbook do.

- Test: `between_steps_only_looking_around_runs_and_the_run_continues_where_it_was`.
2026-10-25 05:16:37 -04:00
prxnvt 7dad14e77e Engine: the macro debugger locks its workbook to looking around, ends with Stop Action and checks its parameters
- `macro.debug` refuses to run as a step of a script or macro, and is never recorded (the
  recording buffer and Record Actions' journal both leave it out); a debugger whose undo group
  something else closed locks nothing, and its next action says the run had ended instead of
  reporting a keep or a rollback. Tests: `the_debugger_runs_on_its_own_and_is_never_recorded`,
  `a_debugger_whose_group_was_closed_elsewhere_locks_nothing`.
- Stop Action is no longer refused under the debugger: it rolls the run back, ends the debugger
  and names the macro. Test: `stop_action_stops_a_macro_being_debugged` (was
  `stop_action_waits_while_a_macro_is_being_debugged`).
- Between steps the debugged workbook runs only `macro.debug`, queries and an allow-list of
  commands that look around (selection, sheet changes, Go To, Find, Copy, zoom, Switch Window,
  Close, Stop Action); everything else is refused, saving and view modes included. The run's
  active sheet and selection are put back before its next step. Test:
  `between_steps_only_looking_around_runs_and_the_run_continues_where_it_was`.
- Only the top-level `macro.debug` call rolls the run back after a panic; a panic nested in a step
  is that step's error. Test: `a_panic_inside_a_step_is_that_steps_error_and_the_run_goes_on`.
- `keep` and `breakpointsOnly` must be true or false, breakpoints must be step paths of the macro
  (at most 10,000), and the action is checked before breakpoints change. Test:
  `debugger_parameters_are_checked_before_anything_changes`.
- Answers: `executed` counts the run's own steps (not the footprint's), `shifted` and `wroteFiles`
  are reported, a rollback's message names the files that stay, `changed` lists deleted and
  renamed sheets and at most 500 entries with `changedCells`, and a Repeat over whole rows or
  columns shows the part in use. Tests: `the_debuggers_answers_count_its_own_steps_and_say_what_stays`,
  `the_debugger_lists_deleted_and_renamed_sheets_and_caps_the_list`,
  `the_debugger_shows_a_repeat_over_whole_columns_as_the_run_goes_over_them`.
2026-10-25 03:17:42 -04:00
prxnvt ce2ab9a473 Merge the footprint pull request (c715c36c, with #2144) into #2145
# Conflicts:
#	docs/macros.md
2026-10-25 02:50:17 -04:00
prxnvt 6a004bf610 Engine: stopping Record Actions waits while a macro in its workbook is being debugged
Stopping Record Actions saves a script into the workbook, which the debugger lock refuses while a
macro there is paused. The refusal came after Record Actions had taken its recording, so the
recording was lost. Stopping is now refused before anything changes, and stopping again after
the run saves the script.
2026-10-22 02:26:32 -04:00
prxnvt f553619b33 Engine: the macro debugger lock also refuses edits that another command runs
Session::execute checked the debugger lock only for top-level undoable commands. A command that is not undoable could run edits as nested commands and skip it: stopping Record Actions while a macro in the same workbook was being debugged saved the script inside the run's undo group, and stopping the run without keeping its changes deleted the script again. The lock now applies at every depth, and only the debugged run's own steps go ahead.
2026-10-22 02:26:32 -04:00
prxnvt ccea7a8db3 Engine: macro debugger reports a step that panics as the step's failure
When a debugged step panicked, the nested execute rolled the run back and dropped the debugger
before advance could reattach the machine, so the caller got "No macro is being debugged"
instead of the failed step. For example, stepping into a step whose command panics lost the
step path and the panic message. advance now sees that the run was already rolled back and
returns the usual failed result with the step error.
2026-10-22 02:26:32 -04:00
prxnvt 45e580ad91 Engine: macro.debug steps through a macro as one undo step
macro.debug runs a macro one step at a time. start checks the macro as
macro.run does (policy, approval, inputs, footprint and output rule)
and pauses before the first step; step runs one step; continue runs to
the next breakpoint; runTo runs to a chosen step path, stopping at
breakpoints on the way; stop ends the run and keeps its changes or
rolls them back; state reports where it is. Breakpoints are the steps'
own flags plus a list of paths given with any action (breakpointsOnly
makes the list replace the flags), and they stop in every pass of a
Repeat.

The run lives on the session between calls, inside an undo group that
spans them (group_begin and group_end), so a debugged run is one undo
step "Run Macro: <name>", as a normal run is. A failing step ends the
run and rolls it back; so does a Stop step that asks for a rollback.
While a macro is being debugged, edits of the workbooks the run touched
(its own, and any other a step changed) are refused at the top level
with "Finish or stop the macro first"; other workbooks stay editable,
and selecting and queries still work. Every answer gives the next
step's path, kind, command, parameters as they would run now (tokens
resolved), the Repeat pass, the parameters of the step that just ran,
the steps executed and the cells changed so far. Each action gets its
own time limit.

If a command panics while a step runs, the session's panic guard rolls
the debugged run back as well, so its undo group never stays open.
2026-10-22 02:26:32 -04:00