Record Phase B evidence and roadmap status
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,28 @@
|
||||
# Orbit TV 0.40.0 verification
|
||||
|
||||
Smart Channels Phase B: Terra and After Dark on the same engine as Paradox. Also a guide day jump and a clearer switch.
|
||||
|
||||
## Changed
|
||||
- A film channel is a configuration with a rest period. Films past their rest are picked by a generator seeded from the start time, or the longest-waiting film if none has rested.
|
||||
- After Dark (102): Paul's chosen films plus 30 curated titles, exact title matches only, 48-hour rest. Terra (140): up to 8 of 10 curated nature series.
|
||||
- Holding left or right in the guide jumps a day. The switch says ON or OFF and ignores a second press within 5 seconds.
|
||||
|
||||
## Checked on the box, 2 November 2026
|
||||
| Channel | Pool | Programmes in 7 days | Requests | Read | Plan | Stored | Most airings | Smallest gap |
|
||||
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|
||||
| After Dark | 33 films, all 30 picks found | 101 | 30 | 22.6 s | 107 ms | 17.7 KB | 4 | 48.3 h |
|
||||
| Terra | 63 episodes, 8 series | 184 | 16 | 6.9 s | 137 ms | 31.5 KB | 6 | 29.1 h |
|
||||
|
||||
- Film runtimes 84 to 133 minutes, Terra 49 to 59 minutes, all back to back.
|
||||
- Schedule files identical after two restarts, with 0 requests. catalogue.db fingerprint unchanged (b630828b...).
|
||||
- Film extension from 5.5 to 7 days: 425 ms, every committed film kept, smallest gap still 48.3 h.
|
||||
- Damaged After Dark schedule and backup: rebuilt in 232 ms with 0 requests. The aired place survived.
|
||||
- Paradox: every programme kept in the plan. Its file grew by 11 bytes at the upgrade, matching a new empty film field. The pre-upgrade copy wasn't kept for a byte comparison.
|
||||
- Tuning this morning, 9 changes: 10 to 20 s in total. Vortex, still on its loop, took 15 to 20 s. Last night's tunes took about 2 s. Measurements point to the provider or time of day, not the engine, but the cause isn't proven.
|
||||
|
||||
## Unit tests
|
||||
- assembleDebug, testDebugUnitTest and lintDebug pass; 182 tests, 0 failures, 8 new.
|
||||
|
||||
## Not checked
|
||||
- The held-key day jump on the real remote, film join-in-progress by eye, and a film becoming unavailable on the box (same code path as Paradox).
|
||||
- Several days of real running on these two channels.
|
||||
+1
-1
@@ -71,7 +71,7 @@ Audit and phased plan are in review, from `docs/briefs/indexing-programming-engi
|
||||
|
||||
## Smart channels status
|
||||
|
||||
Phase A of [the Smart Channels Foundation brief](briefs/smart-channels-foundation-2026-11-01.md) passed Paul's review on 2 November 2026, with Paradox on the box (VERIFICATION-0.39.0.md). Phase B (Terra and After Dark) is built as 0.40, in testing. Phases C and D (Vortex, the remaining channels) need separate approval. Animated idents are design files only and aren't in the app yet.
|
||||
Phase A of [the Smart Channels Foundation brief](briefs/smart-channels-foundation-2026-11-01.md) passed Paul's review on 2 November 2026, with Paradox on the box (VERIFICATION-0.39.0.md). Phase B (Terra and After Dark) is on the box as 0.40, tested and awaiting Paul's review (VERIFICATION-0.40.0.md). Phases C and D (Vortex, the remaining channels) need separate approval. Terra's pool repeats within a week, so it needs more series or a rest rule. Animated idents are design files only and aren't in the app yet.
|
||||
|
||||
## Programming director
|
||||
|
||||
|
||||
Reference in New Issue