# 0.105.0: story grouping on Vortex (Stage E, third channel)
|
|
|
|
Vortex's `ChannelProgramming` now has `storyGrouping = true`. Heroes and Orbit X stay on `StoryGroupingChannels`.
|
|
|
|
## Checks
|
|
|
|
- 467 unit tests run, 0 failures; lint clean.
|
|
- **Four-week replay** from the box's plans and pools at 18:27 today. Every fingerprint is identical to 0.104.0 except Vortex, and Vortex's committed bookings are unchanged.
|
|
- **Vortex over the four weeks:**
|
|
|
|
| | 0.104.0 | 0.105.0 |
|
|
|---|---|---|
|
|
| Programmes | 1,707 | 1,705 |
|
|
| Story openers followed by part 2 | 0 | 57 |
|
|
| Openers left hanging | 58 | 2 |
|
|
| Later parts aired alone | 76 | 11 |
|
|
| Same episode again within 7 days | 1 | 0 |
|
|
|
|
- **Afterburn premiere:** still on time, episodes 1 and 2 on 21 November and 3 and 4 on 28 November.
|
|
|
|
| Night | 0.104.0 | 0.105.0 |
|
|
|---|---|---|
|
|
| 21 November | 21:08 | 21:02 |
|
|
| 28 November | 21:00 | 21:07 |
|
|
|
|
The 28 November start is within the premiere's 10-minute grace. Dragon Ball Movie Night bookings: 20 before, 21 after.
|
|
|
|
**What's left apart:**
|
|
- **Attack on Titan:** most of the 11 later parts are its Struggle for Trost, which runs 9 parts. That's past the 6-part limit, so it isn't grouped. It plays in order across days, as a serial, which is the case Paul's "serial slots" idea covers.
|
|
- **Two others:** a Yu-Gi-Oh! Zexal opener and a Gravity Falls part 2 whose part 1 isn't numbered as one.
|
|
|
|
APK: `outputs/revision-0.105.0`, signed. Not installed.
|
|
|
|
## Installed on the box (4 November 2026, 19:19), without opening Orbit
|
|
|
|
Paul said "install". Installed with `adb install -r` only, while Silo stayed in front.
|
|
- **Snapshot first:** copied to `install-0.105.0-20261104-191924`, and on the box to `no_backup/schedule-rollback-0.104.0`.
|
|
- **Install:** versionCode 154.
|
|
- **Schedule files:** identical before and after.
|
|
- **Not yet done:** top-ups wait for the next open, when Paul will ask for a check.
|